Younger Building Edinburgh

THE PROJECT SCOPE

Client: G&T/GHI Contract
Project size: 247m 2
Materials: Renovation Screed Fully-Bonded

THE PROJECT DETAILS

IRS was contracted to prepare the existing concrete substrate in the main reception area of an Office refurb. This was to facilitate the installation of large-format ceramic tiles in all areas.

THE PROJECT GALLERY