Shortbread House

THE PROJECT SCOPE

Client: G&T/Insite Contracts
Project size: 120m 2
Materials: HB Epoxy

THE PROJECT DETAILS

As part of the extension of the production and storage facilities at an east coast shortbread factory, IRS was instructed to update the floor finishes throughout the storage areas. Mechanically remove existing paint coating and apply two coats of HB Epoxy.

THE PROJECT GALLERY