Shawfair Factory Fit Out

THE PROJECT SCOPE

Client: Muir Construction
Project size: 700m 2
Materials: 2 Coats HB Epoxy to match client RAL

THE PROJECT DETAILS

IRS was awarded the contract to carry out the preparation of the existing concrete substrate and thereafter apply two coats of high-build epoxy coatings to two separate areas.

THE PROJECT GALLERY